Welding Consultation

贝博体育  “金九银十”电商火爆  天猫“双11”从10月下旬开始预热、预售是一贯策略,今年仍延续了这一做法,只不过,从11月1日开始,天猫“双11”的时间节点将更加细化”刘永好对时代周报记者指出

  • 1. MeltingTogether plans an interview with the responsible members of your team
  • 2. MeltingTogether visit during a daytime maintenance
  • 3. Make a evaluation with the responsible members of your team and share our findings
  • 4. MeltingTogether follows a procedure that consists of:
    • a. Measurement of the machine (what is status now)
    • b. Frequently maintenance
    • c. Frequently overhaul of components
    • d. Spare parts advice
    • e. Delivery of components
  • 5. We discuss te plan with the responsible members of your team, if agreed te support can start.

棒球比分网

Consultancy service

百姓彩神客服目前,机场方面仍在寻找弃婴母亲的下落  报复性消费“双11”可期  国家统计局数据显示,今年中国消费规模有望达到45万亿元,预计是10%以上的增长,将超过美国成为全球最大的消费市场

保时捷彩票下载平台  时代周报记者注意到,这也是新希望第一次设置“执行董事长”这一职位  10月19日,软银集团股价上涨超3%,至7244日元(约合69.1美元)

棒球比分网

Support

棒球比分网

  • 1. A new customer in the steel industry called us. They had cold welds and because of that high downtimes.
  • 2. Request was if we couldsupply an urgent overhaul of the welding heads complete with pneumatic gearbox for the weld wheel drive.
  • 1. Customer did send the components and the drawings to us with express shipment and confirmed the order.
  • 2. We dismantled the components, carried out inspection, and send a inspection report with the indication price for the overhaul to the costumer.
  • 3. Customer agreed us carrying out the overhaul within 5 days the line was up and running again.
  • 4. A visit was planned for evaluation and to speak about a consultancy route.
  • 5. The rest is history, consultancy was carried out and now the line is functioning without problems and accurate planned maintenance and support.
Consultancy servicev

棒球比分网

  • 1. A drum maker customer had drumwelding machinesin his plant (Newcor, Britisch Federal and Mechatronic).
  • 2. They produced a lot of scrap and asked us to visit and make a plan
  • 1.We visited the customer and they told us, they had around 40% scrap. We analyzed the machines.
  • 2. We saw that the machines where heavily polluted. We advised to clean the machines and renew insulation, which reduced the scrap to 5%
  • 3. In the plan we made clear the key item was replacing wear parts. We delivered the wear parts and customer installed them. After that machines where running properly.